CENTRAL WATER TREATMENT PLANT (CWTP), COMILLA EPZ

All Civil Mechanical & Electrical Works.

Tenure: 30 years.

Project Cost USD 8.88 Million.

Designed and constructed the WTP along with production wells and pressure boosting system.

Technologies used: Iron Removal Filters (IRF), Sediment Filter (SF), Multi Media Filter (MMF), Demineralization (DM), Chlorination and De-chlorination.

Treatment Plant, Capacity: 6.0 MGPD

Production wells, Pressure Boosting System.

Pipe lines (05 KM) up to 600 mm dia.

25 m Dia. & 11 m Depth Semi-Ground RCC Clarifier, RCC.

Equalization Tank and different types of RCC Water Treatment Structures..

7 k m effluent Collection network up to 1500 mm dia.

Raw water source: Groundwater.

Total number of industries serving: 50+.

Total number of workforce in the EPZ: 40,000+ .

WTP operating since 2010 .

30 years contract (auto renewable) with Bangladesh Export Processing Zone Authority (BEPZA) under Prime Minster Office.

WTP capacity: 23,000,000 Liters/Day .